It is the first Monday back in January. The gate is open, the programme says formwork starts today, and you are four short. Two of the labourers who finished the year with you have taken jobs closer to home. One is still overseas. The fourth is not answering his phone. You ring your provider and so does every other site manager who opened their gate this morning.
That morning is decided in November and December, not in January. The sites that restart cleanly are the ones that sorted their crew before they knocked off for Christmas.
Why the January restart is harder than it looks
Everyone restarts at once. Most of the industry stops for some version of the same summer break and comes back within the same week or two. Demand for labour does not ramp up gently in January. It jumps, on the same day, across every site in the city.
Casual crews drift over the break. Your own employees go on leave and come back. Casual and labour hire workers generally are not paid while the site is shut. Over three or four weeks, some will pick up other work, some will travel, and some will decide to try something different in the new year. None of that is bad behaviour. It is what happens when people have bills and no shifts. But it means the crew you finished with is not automatically the crew you start with.
The industry was already short. Master Builders Australia's Workforce Blueprint puts the construction workforce shortfall at 141,000 workers. In September, as the national unemployment rate edged up, its chief economist noted that the industry still cannot find enough "site-ready workers". More people looking for work does not mean more people with the tickets, the experience and the induction to be useful on your site on day one.
January is the hottest month to start in. Workers coming back from three weeks off are not used to working in the heat, and the first week back is often the hottest of the year. Safe Work Australia is clear that the person running the site has to manage heat risk — shade, cool water, scheduling the physical work for the cooler part of the day — and its guidance on working in heat recommends giving workers time to acclimatise. A crew that is short-handed on the first day back is a crew that pushes too hard in the heat.
Six things to sort before you shut the gate
1. Give your provider the restart date and numbers now. Not on the last Friday before Christmas. Tell them when you reopen, which roles you need back in the first week, and roughly how that grows through January. A provider who knows in November can plan around it. A provider who finds out on the morning you reopen is ringing the same people as everyone else.
2. Name the people you want back. If there are workers you would have back tomorrow, say so, and ask the provider to confirm them for the restart before the break — not after it. People are far more likely to come back to a job they have been asked back to and given a start date for.
3. Check what expires over the break. Licences, tickets and site-specific inductions do not all line up neatly with the calendar. Ask your provider to check every returning worker's high risk work licences and other tickets against the January start, and to sort any renewals before they lapse.
4. Plan the first morning back. A proper restart toolbox: what has changed on site since December, any new trades on the job, the traffic management plan, and how heat will be managed that week. Treat the first day back as a mobilisation, not a normal Tuesday.
5. Ease into the heat. Put the heaviest work on the coolest part of the day for the first week back, build in extra breaks, and make sure the supervisor knows the signs of heat illness. That applies to labour hire workers as much as your own — under the WHS laws, the duty sits with you as the host as well as with the provider.
6. Agree how the gaps get filled. Somebody will not come back. Agree now how many screened backups the provider will have ready for your first week, how fast they can be on site, and who rings whom when a gap appears. That conversation takes five minutes in November. On the first Monday in January it takes all morning.
What a good provider is doing right now
A provider worth keeping is already having this conversation with you. They are asking about your restart date, confirming which workers are coming back to which sites, chasing ticket renewals, and building a pool of screened, inducted workers who are ready to go in the first week of January. If your provider has not raised it yet, raise it with them — and pay attention to the answer.
The plain version
The January restart is one of the most predictable labour crunches in the construction year, and it still catches sites out every summer. Tell your provider your restart date and numbers now, name the people you want back, check what expires over the break, plan the first morning, ease the crew into the heat, and agree the backup plan before you shut the gate. Do that, and the first Monday back is a work day instead of a phone day.
EIR Labour Hire
EIR Labour Hire has supplied workers across civil, construction, manufacturing and warehousing since 2003 — over 22 years. We place labourers, operators, tradies and admin support across New South Wales, Queensland and South Australia, and we are licensed in every state that requires it.
Ring us before the break and we will work through your restart date, the workers you want back and the tickets that need checking, so the first week back is planned before you knock off. Every worker is screened face to face and skill-checked before they arrive. If you are building in Sydney or across NSW, talk to us about construction labour hire in Sydney before you knock off for Christmas.
Sources: Master Builders Australia, media release "New labour force data release following warnings that construction is 141,000 workers short" (24 September 2026) and Workforce Blueprint (2026); Safe Work Australia, Working in heat (construction duties tool) and Guide for managing the risks of working in heat. This article is general information, not legal or WHS advice — check with your state WHS regulator for the rules that apply to your site.